• To be frank, testing could be never ended up, it’s a continuous process. Even after the application delivery, the testing could still continue.

• But, there are few parameters / criteria by means of which we say, we could stop testing.


 When all the customer requirements are covered in the application and tested as well.
 When all the testing (Functional , Integration, System, Regression, UAT, Compatibility, Install/Uninstall, Load, Performance, stress and so on) are done.
 When the QA Metrics show 100% quality of the application
 When all the test cases (functional, integration, system and so on) are executed.
 When Application is delivered to the end user and maintenance is done.
 When Application is bug free (Quality enough).