• To be frank, testing could be never ended up, it’s a continuous process. Even after the application delivery, the testing could still continue.
• But, there are few parameters / criteria by means of which we say, we could stop testing.
When all the customer requirements are covered in the application and tested as well.
When all the testing (Functional , Integration, System, Regression, UAT, Compatibility, Install/Uninstall, Load, Performance, stress and so on) are done.
When the QA Metrics show 100% quality of the application
When all the test cases (functional, integration, system and so on) are executed.
When Application is delivered to the end user and maintenance is done.
When Application is bug free (Quality enough).
No comments:
Post a Comment